PDAM Way Rilau, Bandar Lampung City and PT. Adhya Tirta Lampung (ATL)
Completed/Project Experience
Bandar Lampung, Province Lampung
PDAM Way Rilau, Bandar Lampung City and PT. Adhya Tirta Lampung (ATL)
16 Apr 2018 - 16 Aug 2020
Project Supervision
Project Name
Independent Supervision Consultant of Government Cooperation Project with Business Entities Drinking Water Supply System, Water Supply Company “Way Rilau” at Bandar Lampung
Country
ID
Location
Bandar Lampung, Province Lampung
Clients
PDAM Way Rilau, Bandar Lampung City and PT. Adhya Tirta Lampung (ATL)
Association
N/A
Duration of Assignment
24 months
Start Date
16 Apr 2018
Completion Date
16 Aug 2020
Approx. Value of the Contract
USD 385190
The Project of Bandar Lampung Water Supply System was built in the scheme of the Public-Private Partnership (PPP). The project was held to build an intake of raw water intake (intake) with a capacity of 825 liters/sec. This project is planned to produce a Drinking Water Supply System with a capacity of 750 liters/sec, transmission pipes, reservoirs, and distribution pipelines for pump systems and supporting facilities.
This project has an output capacity of 750 liters/second
with the quality of drinking water to meet the needs of drinking water as much
as approximately 60,000 House Connections (SR) in 8 (eight) districts in the
city of Bandar Lampung which include the districts of Rajabasa, Labuhan Ratu,
Way Halim, Kedaton, Tanjung Senang, Sukarame, Sukabumi, and Kedamaian, 24 hour
service available.
The Managing Entity (PJPK) will carry out the Project with a Build, Use and Delivery scheme for a period of 25 (twenty-five) years from the Commercial Operation Date with an estimated investment cost of the BUDP Project of Rp. 700,000,000,000,- (seven hundred billion Rupiah). Through the Cooperation Agreement for the Development, Operation, and Maintenance of Drinking-Water Supply Systems in Bandar Lampung City Number: KU / 391 / PDAM / 08 / II / 2018, between the Way Rilau Regional Drinking Water Company (as the Responsible for Project Cooperation or "PDAM" and PT Adhya Tirta Lampung (as an Implementing Business Entity or "BUP") In the preparation of DEDs and the Construction of Water Projects, supervision is needed to maintain the quality of the results carried out by DED Consultants and Contractors through Work Order No .: 05 / ATL / IV / 2018. , PT Adhya Tirta Lampung assigned PT Kogas Driyap Consultant as an Independent Supervision Consultant.
Services provided in the assignment: